Main / Reviews
CUSTOMER REVIEWS
... to recognize the results of Pilot industrial tests of KOS PS254-KN as successful...
... to recommend the use of the KOS PS254-KN Well Cleaning Complex in order to reduce the number of launching and lifting operations during the TCRS at RN-Yuganskneftegaz LLC...
… the advance of the PS254‑KN01 unit amounted to 46 m; 400 L of proppant and salt were recovered...
… there is no need to use D-105…
... the combined nozzle model KN‑02 enables drilling out heavily compacted proppant and sand blockages in wells with restricted circulation...
... the use of this equipment made it possible to triple the volume and depth of the plug extraction in one lifting operation...
... It is advisable to implement the technology at the facilities of JSC «Samaraneftegaz»...
... replication of this technology is planned in 2018 in the amount of 800 operations...
... upon reaching the current bottomhole, a 52.42 m interval was reamed...
... It is recommended for implementation at the facilities of JSC «Samaraneftegaz»...
... the PS254‑KN01 complex for milling out plugs and depressurization cleaning of well bottoms is recommended
for implementation at «Bashneft‑Dobycha facilities»...
... the PRS with the cleaning of the bottom of the well D-105 and the use of PS254-KN01 are being considered...
... reducing the cost of repairs using PS254-KN01...
... the success rate was 92.8 %...
... PS254-KN01 is recommended for implementation at the facilities of NGDU «Jalilneft»...
... the economic effect is generated by reducing operating costs...
... PS254-KN01 is recommended for implementation at the facilities of NGDU «Aznakaevskneft»...
... the average penetration was 150.7 meters with the achievement of an artificial face...
... prevents excessive saturation of formations with liquid...
... the efficiency criteria defined by the OPI program have been fully achieved...
... PS254-KN01 is recommended for implementation at the facilities of PAO «Orenburgneft»...
... the goal of the work has been achieved for all wells...
... the technology was recognized as successful and recommended for replication in OAO «CH-MNG»...
Problem Solution:
Decline in production rate of producing wells and injectivity of injection wells equipped with small‑diameter liners (102 mm, 114 mm), with zenith angles up to 92°, in low‑permeability reservoirs (ANPD), caused by blockage of the perforated interval in the productive formation by plugs of various origins.
Result:
... It has been confirmed that the time required to bring producing wells to operating mode has been reduced
by a factor of 5.2...
... rollout is planned for 2018, with a target of 50 operations at PJSC «Orenburgneft»...
... all criteria for evaluating the effectiveness of the PSM254-UOPV technology have been met...
... «TatRITEKneft» CCI plans to introduce 200 operations in 2018...
... Since 2018, LLC «Management Company “Sheshmaoil”» has been implementing a practice across all wells in its production fleet. The practice involves using the PSM254‑UOPV well cleaning system (KOS) to treat wellbore fluid immediately prior to lowering downhole equipment (GNO), with the aim of preventing clogging of the intake screen by floating deposits and foreign matter...
... preventive use makes it possible to reduce the number of wells that have been repaired due to clogging of the ECN receiving grid...
... the penetration was 7.3 meters with the extraction of 85 liters of bottom-hole sludge from the well...
... the reduction in time for cleaning the face was 60 hours for six operations...
















